Stop Vanity Solar: Richland Township, Prairieville Township Michigan

stopvanitysolar.org/richland

Facebook group: Richland against Solar Panels

Liberty Farms Solar Application

Citizen-landowner Investigator and Website Contact: kevin.c.davis@gmail.com

INTRODUCTION

This special project and rudimentary for now, web site is a platform for various community engagement ad hoc needs.  As of August 2026 these are:

  1. A means to access our entire body of work using a QR code.  The Township prints and records paper versions.  Hard copies are shared at all levels of government.  Following a QR code (or our simple site URL) to the online versions bridges the paper/digital divide
  2. A means for community citizen-landowners to use our GIS capabilities interactively
  3. A means to rapidly deploy collaborative counter-measures in theatres of engagement beyond the Township Planning Commision era, if needed

🤚🌎🧭🌐⚖️📏📐🇺🇸🔎 Geographical Information System (GIS) 🔍🇺🇸📐📏⚖️🌐🧭🌎✋

Interactive reference map showing proposed project panel super-arrays, >180° encirclement wedges, georeferenced wetland site plans, and local property boundaries. Landscape orientation may be best on mobile devices. Click any feature for details or toggle layers via the top-right control. Zoom in and out as needed. Click-drag-HAND to reposition map. Click on a parcel to see parcel id and owner. On "red" encirlement wedges click for the parcel id, owner and total encirclement degrees

⚠️ DRAFT, UNAUDITED, RESULTS – CONSIDERED EXPERIMENTAL ALPHA RELEASE ⚠️

Loading parcel & spatial layers...

This map is as of July 2026

Known Issues

  1. The base site plan image (panel arrays, vegetation and wetlands) is low resolution due to a fair use image scrape from the site application
  2. Parcels in close proximity to a super panel array concave region have less "red" wedge coloring than what the parcel encirclement demands

An Unlawful Encirclement: The Legal, Ethical, and Moral Inadmissibility of the Proposed Siting

The spatial analysis displayed above identifies 43 non-participating residential and agricultural parcels in Richland Township encircled by proposed utility-scale solar arrays across a perimeter span exceeding 180 degrees. This spatial geometry renders the proposed footprint legally, ethically, and morally inadmissible under three foundational legal pillars:

  1. Public Act 233 and the Mandate of "Prudence": Public Act 233 requires state-level siting decisions to evaluate environmental and community impacts with statutory prudence. As established in Michigan Public Service Commission (MPSC) precedents regarding infrastructure routing—such as the contested Rose & Robert Williams transmission line decision (Case No. U-21471)—the sheer count of heavily affected, non-consenting private parcels serves as a vital benchmark against arbitrary routing. Overriding township-level zoning harmony to subject dozens of non-consenting families to semi-encirclement by industrial-scale power electronics and panel banks violates any reasonable standard of administrative prudence.
  2. Michigan State Constitution & Inverse Condemnation: By surrounding quiet residential homes and active farms with heavy industrial-scale infrastructure, the project accomplishes an effective inverse condemnation—unlawfully stripping private properties of their rural zoning character, quiet enjoyment, and market value without due process or local legislative consent.
  3. U.S. Constitution (Fifth Amendment Takings Clause): Constructing an industrial envelope around a homestead constitutes a regulatory and physical "taking" without just compensation. Private property rights cannot be sacrificed to satisfy a utility developer's private commercial narrative.

For all the swirl regarding these sitings—hanging out there and being sinisterly oblivious to these considerations—they await eventual resolution in favor of the home owners so sacrificed.

Documents

Our Position Paper

Documents submitted by Sherwood-Davis et al. and registered by Richland Township and conveyed to Prairieville Township

The Compilation

This compilation from the components expressed below is 58 MB in size. It has four new beginning pages including a components table of contents and remarks for Huizenga, Roth and Hall. It has two new ending pages comprising an interim edition for September.

Sherwood-Davis et al. Submissions to the Richland Township Planning Commission: U.S. Representative Bill Huizenga Edition.pdf

The components of the compilation are:

Petition to Intervene-2nd edition.pdf

Incremental Package 20260427 for Richland Township Planning Commision.pdf

Incremental Package, May 25, 2026, for Richland.pdf

Incremental Package, June 2026, for Richland Township Planning Commission.pdf

Incremental Package, July 2026 part 1 of 2, for Richland Township Planning Commission.pdf

Incremental Package, July 2026 part 2 of 2, for Richland Township Planning Commission: SPECIAL FEDERAL EDITION.pdf

Incremental Package, August 2026 for Richland Township Planning Commission_ U.S. Representative Bill Huizenga Edition.pdf

Incremental Package, August 2026, EXTRA EDITION for Richland Township Planning Commission.pdf

Incremental Package, September 2026 for Richland Township Planning Commission - INTERIM EDITION